; Katy Boardwalk District - Project Updates | Houston Real Estate Services | NestSource

Katy Boardwalk District – Project Updates

After releasing preliminary plans in 2015, and still unfinished, many are wondering if the Katy Boardwalk District Project is a failure.

The district is located off Kingsland and Prarie Parkway, with easy access to Grand Parkway, Typhoon Texas, and Katy Mills Mall.

Katy Boardwalk Project Timeline

Preliminary Plans…

Initially, the Katy Boardwalk District project was to include a 73,000 sq ft conference center, 204,000 sq ft hotel, 250,000 office space, and residential space by GracePoint Homes. (article Houston Business Journal 01/2015)

March 2018 update

The boardwalk project was underway with the completion of roads, and walking trails around the 90-acre lake. At the time, the project planned for 650 modern loft residences, 145,000 sq ft of commercial space, 60,000 sq ft of retail space, a conference center, and a hotel. At the time, the estimated completion time would take 10 years. (Houston Business Journal 03/2018)

December 2018 update

Developers were to break ground on the residential aspect of the project in January 2019.

January 2019 update

It was announced the hotel project would be Hyatt Regency Katy Boardwalk Hotel & Conference Center, with an intended open date of fall 2021. (Paper City Mag 01/2019)

September 2021 update

In early 2022, the first tenants of the Katy Boardwalk Project were expected to be announced. (Houston Business Journal 09/2021)

November 2021 update

Boardwalk Lofts, one of the Katy Boardwalk District’s first phase projects opened on November 11, 2021. The complex offers 319 units with 16 different floor plans with one, two, and three-bedroom apartments. (Houston Chronicle 11/2021).

August 2022 update

Construction started in Phase 2 of the outer loop trail, which included 1.5 miles of trails paved with natural landscape, wood-type paths and a steel pedestrian bridge, completion of this section was to be completed by the summer of this year (2023). (Community Impact 08/2022)

What Is the future of The Katy Boardwalk District Project?

New Clark City is a new planned city currently being developed on a former military base in the Philippines by the Bases Conversion and Development Authority (BCDA) and various private sector companies. The city is expected to be the country’s first smart, resilient and green metropolis.

What is the completion date for The Katy Boardwalk District?

The future for Filipinos While reclamation for the 407-hectare project begins this year, the entire city is expected to be completed by 2035.

Does Katy Need its Own City Center?

Smart cities are designed for optimum usage of space and resources along with an efficient and optimum distribution of benefits. It also aims at increasing connectivity at various levels among citizens, as well as between the administration and the population.

Katy Boardwalk District Hotel

Boardwalk Lofts

Restaurants

Scholars & Scoundrels

  • 1251 Pin Oak Road

Park Place at The Boardwalk

  • 25551 Kingsland Blvd., Ste. C102, Katy

Join The Discussion

Compare listings

Compare

REQUEST DETAILS

Tell us how to reach you and we’ll get back in touch.

Skip to content